Sole ZOOMLION Tower Crane Distributor for Canada ·  Sole ASCOREL Distributor in Canada
QnQ Solutions

HomeGuides › Maintenance schedule

What a Real Tower Crane Maintenance Schedule Contains

Most people picture a maintenance schedule as a list of dates. On a tower crane close to half of it is not dates at all — it is operating hours and events, and those are the parts that get missed.

Four different clocks

A tower crane programme runs on 4 things at once, and a system that only understands one of them will quietly lose track of the others:

  • Dates — daily, weekly, monthly, quarterly, six-monthly, annual.
  • Operating hours — gearbox oil, brake wear and similar, read off the hour meter, not the calendar.
  • Events — erection, climbing, dismantling. These fall due when the work happens.
  • Expiry dates — engineering inspections, structural NDT, major component inspections, insurance. These lapse rather than recur, and the five-year ones are the ones that catch people out, precisely because they never appear on anything you look at monthly.

The standard's side

CSA Z248-17 — 134 separate requirements
How oftenItems
Every day it is used19
Every week12
Every month25
Every 6 months1
Every year10
On erection, climbing or dismantling67

The manufacturer's side

2 machines, two completely different schedules. Anyone who runs a mixed fleet off one generic checklist is putting the wrong figure on a brake.

ZOOMLION R275-12RB, saddle jib — 112 separate requirements
How oftenItems
Every day it is used18
Every week3
Every month13
Every 3 months5
Every 6 months10
Every year9
On erection, climbing or dismantling37
Every 2000 operating hours5
Every 21 days3
Every 1500 operating hours1
Every 2400 operating hours1
Every 10 days1
Every 400 operating hours1
Every 100 operating hours1
Every 450 operating hours1
Every 3 days1
Every 500 operating hours1
Every 10000 operating hours1
ZOOMLION RL250-16RB, luffing jib — 101 separate requirements
How oftenItems
Every day it is used14
Every week8
Every month17
Every 3 months3
Every 6 months4
Every year7
On erection, climbing or dismantling34
Every 7500 operating hours4
Every 100 operating hours2
Every 1500 operating hours1
Every 10000 operating hours1
Every 2400 operating hours1
Every 730 days1
Every 500 operating hours1
Every 2 days1
Every 3 days1
Every 10 days1

The two most missed items on any tower crane both fall due after the erection crew has left: the bolt retorque at a set number of service hours, and the bolt check about a month after erecting. Neither is on a calendar when the crane goes up, and neither is anybody's job unless somebody has written it down.

A crane sitting in the yard is not a crane with nothing due

Some items are triggered by time regardless of use. A slewing bearing needs greasing on an interval whether or not the crane has turned. Hydraulic seals have a shelf life. For a rental fleet that matters more than for an owner-operator, because machines spend real time between rentals.

Related guides

Talk to us

We Run 347 of These Requirements on Our Own Cranes

Every machine comes with its inspection and service record kept against it, and we send the certificates the day you ask. If you need a crane, or a hand with the paperwork on one you already have, get in touch.